SMART-1 ready for launch

九月 22, 2003

Paris, 19 Sep 2003

The launch date for ESA's SMART-1 mission to the Moon is confirmed as during the night of -28 September 2003.

The 'launch window' will be 8:02 p.m. to 8:21 p.m. on Saturday, September, local time in Kourou, French Guiana, and 1:02 a.m. to 1:21 a.m. on Sunday, 28 September, CEST.

Earlier this week, the SMART-1 spacecraft completed the first 30 metres of its trip to the Moon when it was put on board its Ariane 5 launcher at the Kourou spaceport in French Guiana.

As ESA scientists and engineers watched, the spacecraft looked very small, with its Ariane 5 mounting adapter, when it was raised the 30 metres up to the top of the launcher inside the Final Assembly Building (BAF). Within an hour it was sitting on the rocket's upper stage.

The spacecraft is pictured here being made ready for flight and having its solar panel array protection removed. The next step is to enclose the spacecraft with the 2.6-metre raising cylinder, which carries the second passenger satellite, E-Bird, on top of SMART-1.

European Space Agency
http://www.esa.int/export/esaCP/index.ht ml
Item source: http://www.esa.int/export/esaCP/SEMYJ90P 4HD_index_0.html

请先注册再继续

为何要注册?

  • 注册是免费的,而且十分便捷
  • 注册成功后,您每月可免费阅读3篇文章
  • 订阅我们的邮件
注册
Please 登录 or 注册 to read this article.
ADVERTISEMENT